What is Quick Changeover? (SMED)

 

Quick Changeover (often known as Single Minute Exchange of Die or SMED) is one of the more mundane aspects of Lean Manufacturing and is often ignored. This leads to the creation of several vicious circles in the business system.

Risk & Difficulty Loop

When we run large lots of each product, setups on that product are infrequent. Setups take skill, practice and coaching, much like golf. When operators perform setups infrequently they do not learn them well. 

This leads to the perception that setups are difficult and risky. (You never know how long it will take or whether the product will be right). The perceptions of risk and difficulty encourages large lots and thus fewer setups.

Piece Cost Loop

With large lots, a fixed setup cost is amortized over a large number of units. This seems to reduce the unit cost. There are offsetting costs associated with the resulting inventories, but these offsetting costs are usually buried in the overhead. This also encourages large lots or runs.

Results

The consequence is high inventory and complex scheduling. These give rise to a plethora costs and negative consequences. The black hole of overhead sucks in most of the costs. Other penalties such as erratic deliveries are far removed from the fundamental cause and it is difficult to link cause and effect. Limiting mechanisms prevent lot sizes from going to infinity but these are often weak.

The leverage point in this system is in the risk perception loop. If we can make setups fast, easy and predictable the loop reverses into a "virtuous cycle". Easy setups encourage small lots and small lots mean more setups which increases confidence and setup skill. In addition, the piece cost loop becomes very weak.

As a result, inventory comes down and scheduling is easier, The flow of costs into the Black Hole slows as people spend less time expediting, searching and chasing.

Quick changeover (SMED) ties in with many other reinforcing loops in a Lean System. When the loop reverses and lot sizes come down, it allows the use of Kanban and other simple scheduling methods. 

Kanban introduces other loops that further reinforce the reduction in lot sizes. Workcells are most effective with small lots and setup reduction makes cells feasible or helps them perform better. Kanban also fits well in many workcells.

 

   
   

G.R. Technologies 
75 Allingham Gdns 
North York, Ontario
M3H 1X9

E-mail: info@grt77.com
Tel: (905) 597-9277
Fax: (416) 638-4866

 

GRT Home About GRT Seminars Consulting News and Views Contact Us